Pilot for energy consultants and industrial sites

Can the new machine fit within the existing grid limit?

Turn connection terms, load profiles and equipment constraints into a reviewable scheduling and storage study.

Apply for a measured pilot

No customer documents are needed to register.

15,014

Dutch consumption requests were waiting for grid capacity at the end of 2025, representing 9,305 MW. Source

What the engineer sees, from our 9-document test

Every number must earn its way into the calculation

650 kW grid limit

D6, line 7

Quotation verified

Gecontracteerd transportvermogen afname: 650 kW.

88% efficiency

D9, line 8

Blocked by the program

Round-trip efficiency cannot be used as efficiency per direction.

73 kW equipment

D3 and D8

Held for engineer review

The total requires a cross-document calculation: 10 × 7.3 kW.

Current state

Calculation locked

Two engineering decisions are still required.

The workflow

  1. Find the operational and contractual constraints in the dossier.
  2. Let the engineer accept, correct or reject every sourced proposal.
  3. Compare production schedules and battery capacity under the grid limit.
  4. Export the assumptions, citations, calculation revision and result.

What the pilot must prove

We have verified the technical chain on public and constructed data. We have not yet measured time saved on a client dossier.

The pilot compares the current method and the prototype on the same authorised dossier, measuring active time, corrections and critical errors.

Amsterdam pilot list

Apply for a measured pilot

We will contact selected participants for a short scoping call, then compare both methods on one authorised dossier.